Solar Panels From Bangladesh to France: A Buyer's Import Checklist
Six checks stand between a Bangladesh solar panel order and a lawful French sale: module papers, project file, duty proof, importer file, Le Havre clearance, and end-of-life registration. Work them in order, with a worked warehouse rooftop example.
Short answer
To import solar panels from Bangladesh to France, tick six checks in order: prove the exact module with IEC 61215 and IEC 61730 papers plus an EU declaration of conformity, fix the warehouse rooftop configuration, prove the duty position with a REX statement on origin, complete the French EORI and VAT file with ICS2 data, name the Le Havre terminal, and join the French eco-organization for end-of-life duties before the first sale. Price only from a broker-confirmed landed cost.

On this page
Key takeaways
CE marking is a manufacturer declaration, not EU approval: hold IEC 61215 and IEC 61730 evidence plus the EU declaration of conformity for the exact module.
The Everything But Arms preference needs a REX statement on origin for the consignment; an exporter without a REX number may state origin only up to EUR 6,000 ex-works.
French import VAT at 20 percent is reverse-charged on the VAT return since 2022 for holders of a French VAT number, with no cash paid at the border.
France bases the EORI number on the SIREN, and a complete ICS2 Entry Summary Declaration must reach customs before the goods arrive.
Join the French eco-organization for photovoltaic panels and hold a UDI before the first sale; packaging sits in a separate EPR stream.
A buyer in France who orders solar panels from Bangladesh takes on six files at once: the module file, the project file, the duty file, the importer file, the port file, and the end-of-life file. A quotation that looks clean can still leave one of those files empty. This checklist is built for a French buyer importing panels for a warehouse rooftop project. Work each check in the order given, keep the paper for the check with the order, and do not release a bulk payment while a check is still open.

Check 1: Has the supplier proved this exact module for the French market?
Start with the module on the purchase order, not with a wattage band or a catalogue page. Ask the supplier to state the model number, the cell type, the frame and glass construction, the junction box and connector set, the rated power, the dimensions, and the factory that builds that precise version, and ask for the papers that name that version and no other. A paper for a related model, a different factory, or a different materials list does not support the order, even when the brand name matches.
Two IEC standards sit behind most of the papers you will receive, and they answer different questions. IEC 61215-1:2021 sets design qualification tests for terrestrial modules built for long-term outdoor service, and it states that test results are not a quantitative prediction of module lifetime.1 IEC 61730-1:2023 sets construction requirements for safe electrical and mechanical operation and caps the modules it covers at a maximum DC system voltage of 1,500 V.2 The two programmes share samples, so one set can cover both sequences, and a later change in material, design, or internal spacing calls for a new assessment, run under IEC TS 62915 with the IEC 61730 series.2
Paper | What must match the order | What to ask |
|---|---|---|
IEC 61215 test evidence | Exact model, edition, test sequence | Does the report describe the build on the order, or a different build |
IEC 61730 test evidence | Exact model, construction, voltage limit | What material or design change would trigger re-evaluation |
Datasheet | Model, ratings, dimensions, system voltage | Whether every rating matches the certificates and the invoice |
EU declaration of conformity | Exact module, legislation covered, manufacturer | Which harmonized standards support the declaration for this module |
CE marking needs the same discipline. By affixing the CE marking, a manufacturer declares that the product meets all the legal requirements for CE marking and can be sold throughout the European Economic Area, including products made in other countries that are sold in the EEA.3 On Exportain, supplier verification checks cover identity, business registration, export registration, and factory or office photos, and staff review each submission before a trust badge is shown.4 That review looks at documents and photos; it is not a factory inspection, and a badge is not a guarantee of capacity, quality, or delivery.4 The HS code explainer for panels explains how the classification code is built, and the checklist for solar panel quality control covers the inspection behind this check.
Check 2: Is the warehouse rooftop configuration settled before pricing?
A commercial rooftop order fails when the module is right and the project file is vague. Before you compare prices, fix the configuration in writing: the number of modules for the roof array, the spare allowance, the wattage class, the module dimensions and weight, the mounting method, the inverter and system voltage position, and the delivery address and receiving party for the warehouse. In the worked example at the end of this checklist, the order is 1,850 modules in the 550 W class: 1,820 modules for the roof array and 30 spares.
Give written approval for the sample measured against the specification, noting the approved model name, markings, and labelling. Bulk units must match that approval in build, model, marking, and labelling alike; a test report that travels with the sample must name the same model and build as the sample and the bulk units.
Put packing terms into the order: pallet loading, strapping and stacking, edge and corner guards, carton marks, and damp protection. When the load reaches the warehouse, tally pallets and modules with the packing list, compare pallet model and marking with the approved sample and certificate, and take photographs of harm before any pallet is broken down. Record harm on the delivery record straight away and hold the harmed packing until carrier and insurer have inspected it.
Check 3: Is the duty position proved for this consignment, not assumed?
Settle the tariff position before you agree a price. Ask the broker to confirm, in writing, the full code for the exact modules, the measures in force on the entry date, and the duty rate that follows from that code. This checklist states no duty rate for solar panels, because no rate was taken from an opened official tariff source for this article. The broker confirmation is the rate source for the order: file it, and rework the landed cost if the answer changes between quotation and entry.
Origin proof is a separate file from classification, and customs test it shipment by shipment. Everything But Arms gives least developed countries duty-free, quota-free entry for every product other than arms and ammunition.5 Even so, each shipment carries its own origin proof in a checkable form: the document certifies the place of manufacture and supports a claim for reduced or zero tariff treatment.6 Under the Generalised Scheme of Preferences, exporters on the REX register write the statement on origin on the invoice or another trade paper.6 Without REX registration, an exporter may write that statement only where the consignment is worth EUR 6,000 ex-works or less.6 Request the exporter's REX number, verify the statement names the goods in this consignment, and retain origin documents and supporting records for no less than three years after issue.6 The worked example rests on a REX statement being present; with no statement on file, its EUR 0 duty figure falls away.
Check 4: Is the French importer file ready before the container is loaded?
Complete the importer file before loading in Bangladesh. France now bases the EORI number on the SIREN: since 5 April 2023 it has been possible to request an EORI number based on the SIREN, as "FR" plus the SIREN number, because the EORI number must be attributed to a company with legal personality rather than to an establishment.7 Operators without an EORI SIREN number can request one through the SPORANO-EORI online service.7 Ask the broker to confirm the current EORI form for the importing company in writing, and record the declarant, the importer of record, the EORI number to appear on the filings, and the holder of customs and tax correspondence after release.
The advance cargo filing runs through ICS2, the EU Import Control System 2. A complete Entry Summary Declaration must reach ICS2 for every load moved to or through the EU ahead of arrival, so customs can run safety and security risk analysis, and a filing with gaps may be turned away or referred, with delay as the result.8 Connection to ICS2 requires an EORI number issued by a Member State customs authority.8 Hand the carrier and broker the shipment data early, using the invoice wording throughout, ask the carrier in writing for the deadline on this sailing, and amend the filing whenever a fact changes.
French import VAT is handled on the return, not at the border, for a business that holds a French VAT number. Since 1 January 2022, the reverse charge of import VAT has been compulsory and automatic for every company and certain public bodies identified for VAT in France.9 Under the reverse charge, import VAT is declared and deducted simultaneously on the monthly or quarterly VAT return, with no upfront cash advance required.9 The standard French VAT rate is 20 percent, though reduced rates apply to certain categories of goods.9 Solar panels are not in a reduced-rate category named in the source opened for this article, so plan on the 20 percent rate and ask the accountant to confirm the rate category for the exact code in writing. The buyer must hold a French intra-Community VAT number and provide it on the customs import declarations.9 In the worked example, the buyer holds the number and reports EUR 23,680 of import VAT on the return instead of paying it at the border.
Check 5: Does the shipment clear through a named Le Havre terminal?
Put the terminal name in the contract and the booking; a city name alone does not fix the discharge point. Carriers price freight to a terminal rather than to a country, so ask which terminal the booked service calls at. Le Havre built Port 2000 as its container facility meeting European standards, with the first four berths inaugurated on 30 March 2006, six further berths entering service in 2010, and a third phase adding the final two berths.10 Confirm in writing the terminal, its free-time allowance, and the destination charges there before freight quotations are compared.
State the delivery rule with its named place or point, exactly: a vague port name allows the seller to choose a terminal the buyer never had in mind, and the inland bill then falls on the buyer. For container loads, ask the forwarder who bears risk while the box waits at the terminal, and put that answer in the contract. Confirm whether the price covers freight and insurance as far as Le Havre, or only as far as loading in Bangladesh.
Gather the border papers before sailing: duty and VAT assessment, import declaration, test evidence for the exact module, EU declaration of conformity, statement on origin, bill of lading, packing list, and commercial invoice. Cross-check invoice value, module description, quantity, and origin statement across invoice, packing list, advance filing, and declaration; fix wording differences before loading. The import-from-Bangladesh overview and the landed-cost breakdown carry the background behind these checks.
Check 6: Who carries the French end-of-life duties after the panels land?
This check cannot be fixed at the border, and it must not be left until the panels are sold. In France, photovoltaic panels sit inside the electrical and electronic equipment stream of extended producer responsibility (EPR), listed by name among the equipment covered.11 Companies subject to EPR include companies that import the products, and they must either join an approved eco-organization and pay a financial contribution, or set up an approved individual collection and processing system.11
For solar panels specifically, SOREN is the state-approved eco-organization for the collection and recycling of used photovoltaic panels in France, founded in 2014 as a non-profit recovery system.12 In 2023 it recovered 5,207 tonnes of solar modules, of which 3,631 tonnes were processed, managing to recycle up to 90 percent of them, and it collects used panels at no cost to the owners regardless of technology, brand, or year of marketing, financed through an eco-participation contribution paid by companies for each product put on the market.12 Join the eco-organization before the first sale in France, confirm in writing that the membership covers the panels on this order, and record who pays the eco-participation and who declares the quantities placed on the market.
Registration and reporting follow the membership. Companies subject to EPR must be recorded with the Ministry of the Environment, which issues a unique identifier (UDI), and the registration is carried out by the eco-organization the company contributes to, which then transmits the UDI to the company.11 A company subject to EPR under several streams must hold a UDI for each stream, state its UDI in its terms of sale or another contractual document given to the buyer and on its website, and send the eco-organization data each year by 31 May on products placed on the market in the previous year, for transmission to ADEME through SYDEREP.11 Packaging carries its own EPR stream, so ask the eco-organization whether the pallets, cartons, and wrapping on this shipment need a separate declaration.11 Start the membership before the order ships.
Worked example: one warehouse rooftop order, checked line by line
Example figures. The example order is 1,850 modules in the 550 W class for a rooftop warehouse scheme near Lyon: 1,820 for the array, 30 spares. CIF Le Havre is the quotation basis, with a declared customs value of EUR 118,400. With the broker's code and measures for the entry date settled and a REX origin statement from the exporter, duty in the example comes to EUR 0 under Everything But Arms.5 6 At 20 percent on a EUR 118,400 VAT base, import VAT comes to EUR 23,680, shown on the VAT return under reverse charge and not paid at the border; the example buyer holds a French VAT number.9
Line | Example figure | Basis |
|---|---|---|
Customs value, CIF Le Havre | EUR 118,400 | Example figure, as declared; 1,850 modules at EUR 64.00 |
Customs duty | EUR 0 | Example figure; REX statement supports the EBA claim |
Import VAT base | EUR 118,400 | Example figure, broker-confirmed in the example |
Import VAT at 20 percent | EUR 23,680 | Example figure, reverse-charged on the VAT return |
Cash at the border for duty and import VAT | EUR 0 | Example figure, duty EUR 0 and VAT reverse-charged |
Broker fee | EUR 480 | Example figure |
Terminal charges, named Le Havre terminal | EUR 890 | Example figure |
Inland delivery, Le Havre to Lyon warehouse | EUR 1,450 | Example figure |
Inspection on arrival | EUR 980 | Example figure |
Delivered total before onward project costs | EUR 122,200 | Customs value plus EUR 3,800 post-border legs |
Delivered cost per module | EUR 66.05 | EUR 122,200 divided by 1,850 modules |
The arithmetic is: EUR 480 + EUR 890 + EUR 1,450 + EUR 980 = EUR 3,800; EUR 118,400 + EUR 3,800 = EUR 122,200; EUR 122,200 / 1,850 = EUR 66.05 per module. The import VAT of EUR 23,680 sits outside that delivered total, because it is declared and deducted on the VAT return rather than paid at the border. Rebuild the table from real quotations and the broker figures before pricing.
Where a France checklist usually stalls
A declaration that names a related model stalls the order. Datasheet ratings that do not match the certificate stall the installation file. An origin statement for other goods, or an exporter with no REX number on a consignment far above EUR 6,000 ex-works, stalls the preference claim.6 The EORI number belongs to another company in the group. The advance filing uses different words than the invoice, and the referral holds the container.8 The booking names Le Havre without naming a terminal. The French VAT number is missing, so the reverse charge route is closed.9 Membership of the eco-organization starts after the panels arrive, and the first sale waits for the UDI.11 Close each paper gap before loading.
Questions buyers ask about importing solar panels to France
What is the typical minimum order quantity for solar panels from Bangladesh?
This checklist gives no typical quantity, since minimums move with model, production run, and supplier. Each supplier should state its minimum in writing for the exact model, with the basis for that minimum, and the buyer should test it against the array quantity plus a stated spare and breakage allowance. Compare suppliers only on the same delivery basis.
How long does shipping take from Bangladesh to France?
No transit time is stated in this checklist, because none was taken from an opened official source for this route. Get the sailing date, the expected arrival at the named Le Havre terminal, and the onward service to the warehouse for the week of shipment from the carrier or forwarder, then fix the site date from sailing date, terminal arrival, and onward service, adding a stated number of days for inspection and examination. Tell the installer how many buffer days are built in.
What import duty applies to solar panels from Bangladesh to France?
No duty rate is stated as a general figure in this checklist. The amount turns on the full code for the exact modules, the measures in force on the entry date, and the proof of preferential origin for the consignment. Under Everything But Arms, least developed countries receive duty-free, quota-free access for all products except arms and ammunition, but a shipment needs its own REX statement on origin to claim it.5 6 Have the broker confirm the code, the rate, and the preference position in writing for the entry date before pricing. In the worked example, with a REX statement on file, the example duty is EUR 0.
How do I verify a solar panel supplier in Bangladesh?
Verify the supplier on papers that name the exact module, and read the marketplace badges for what they are. Ask for the IEC 61215 and IEC 61730 evidence, the datasheet, and the EU declaration of conformity, all naming the same model, factory, and build, and approve a sample in writing against the same specification.1 2 3 On Exportain, verification checks review identity, business registration, export registration, and factory or office photos, and approved checks earn trust badges; the review is a document and photo review, not a factory inspection, and a badge is not a guarantee of capacity, quality, or delivery.4 A supplier that cannot produce a paper for the exact module has a gap in the file, not a detail to resolve after shipment.
Next steps on Exportain
Work the checks in order, and hold the bulk payment until every check is closed. Raise the requirement, naming the exact module model, the warehouse delivery address, and the Le Havre terminal, by opening a new RFQ; score each reply against the same delivery basis in the supplier directory, and start from the solar-panel sourcing overview — the wider file behind this France checklist starts there. Exportain operates a B2B marketplace where buyers raise RFQs and suppliers quote; its document and photo checks are not a factory inspection, and Exportain stays outside the contract for the goods.4
Sources
- IEC 61215-1:2021 - Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1: Test requirements. International Electrotechnical Commission (accessed )
- IEC 61730-1:2023 - Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction. NEN (accessed )
- CE marking | Access2Markets. European Commission (accessed )
- About Exportain. Exportain (accessed )
- Generalised Scheme of Preferences. European Commission (accessed )
- Proof of origin. European Commission (accessed )
- Towards a single EORI SIREN number for your customs formalities. Service-Public.fr (accessed )
- Import Control System 2. European Commission (accessed )
- Import VAT in France: How the Reverse Charge works. Fiscalead (accessed )
- The history of the port of Le Havre. HAROPA PORT, (accessed )
- Extended Producer Responsibility (EPR) streams. Service-Public (accessed )
- France. REN21 (accessed )